About the Total Needed Forecasting Method
Total Needed forecasting allows you to enter a single serving number that is used to produce every item in a meal period or snack time. Total needed forecasting is used in a bistro or cafeteria setting where you are serving the general population, and therefore production staff just need to know the total amount of servings to produce.
Applying Total Needed Forecasting to a Meal Period
The Total Needed forecasting method is applied to a meal period (breakfast, lunch, dinner) or snack time (snack am, snack pm, snack hs) of the menus in a selected menu service location (MSL).
To apply Total Needed forecasting to a meal period or snack time, complete the following steps:
-
Open the Forecasting Dashboard.
- Click the Forecasting Settings button. The Forecasting Settings slide-out panel appears.
- Click the Forecasting Methods tab.
- From the Menu Service Location drop-down at the top of the screen, select the MSL that the forecasting is to be applied to. The Scheduled Menus section on the panel lists the menus assigned to that MSL.
- Scroll down to the desired meal period or snack time that you want to set forecasting for.
- From the Forecast Method drop-down, select Total Needed. The meal period or snack time section refreshes accordingly with the Produce __ servings of every item, every day row.
- In the field in the Produce __ servings of every item, every day row, enter the number of servings to be produced for each item, every day, for that meal period or snack time.
- Click the Save button to apply your changes.