- Opening the Residence Builder Screen
- Adding a Campus
- Adding a Building
- Adding a Residence Area
- Renaming a Campus, Building or Area
- Deleting a Campus, Building or Area
- Adding Rooms and Beds
- FAQs
Opening the Residence Builder Screen
You open the Residence Builder screen as follows:
- In your Core account, select Settings from the left navigation sidebar. The Settings panel appears to the right.
- From the Settings panel, select People Settings > Residence Builder. The Residence Builder screen appears.
- If your facility has already been built out with units (building, areas, rooms, etc.), then the screen below appears displaying a user-friendly hierarchal structure with expandable/collapsible sections of the units.
- If your facility has not yet been built out, then the screen below appears prompting you to set up the layout of your facility. See the following article: Building Your Residence: Initial Setup.
- If your facility has already been built out with units (building, areas, rooms, etc.), then the screen below appears displaying a user-friendly hierarchal structure with expandable/collapsible sections of the units.
Adding a Campus
If your facility utilizes a campus in its property, then you can add a campus to your account via the following steps:
-
Open the Residence Builder screen.
- Click the Settings button at the top right to display the Residence Layout Settings modal.
- Activate the Campus unit by enabling its slider control to the right.
- Click the Save button to apply your changes and close the modal. A message appears informing you to review your delivery sequence, as adding the campus may have changed the set order. Click OK to this message.
- A campus is created for each building. Your next step is to name each campus. For an undefined campus name, click its ellipsis and select Edit Campus (first screenshot below). The Edit Campus modal appears (second screenshot below).
- In the Campus Name field, enter the name of the campus, and then click the Save button to apply your changes and close the modal.
Note: When you add multiple campuses, the system will automatically sort the campuses in alphanumeric order.
Adding a Building
To add a building, complete the following steps:
-
Open the Residence Builder screen.
- If campus units are not enabled in the residence builder settings, then click the Add Building button at the top of the screen. The Add Building modal appears (screenshot below). Proceed to step 4.
- If campus units are enabled in the residence builder settings, then for the campus you want to add a building to, click its ellipsis and select Add Buildings to Campus (first screenshot below). The Add Buildings modal appears (second screenshot below).
- In the Building Name field, enter the name of the building.
- To enter another building, click the Add New Building link, and a new Building Name field appears for you to enter the building name.
- Click the Save button to apply your changes and close the modal. The newly-added building(s) are listed on the Residence Builder screen.
Note: When you add multiple buildings, the system will automatically sort the buildings in alphanumeric order.
Adding a Residence Area
To add a residence area, complete the following steps:
-
Open the Residence Builder screen.
- If building units are not enabled in the residence builder settings, then click the Add Area button at the top of the screen. The Add Area modal appears (screenshot below). Proceed to step 4.
- If building units are enabled in the residence builder settings, then for the building you want to add an area to, click its ellipsis and select Add Area to Buildings (first screenshot below). The Add Area modal appears (second screenshot below).
- In the Area Name field, enter the name of the residence area.
- If meals are to be delivered to the room, then you will need to enable the residence area for room delivery by selecting the Enable Room Delivery check box and completing the available fields that appear. However, at this point because you are just building out your residence for the first time, you can choose to revisit room delivery configuration later when you are ready. When ready, see the following article: Enabling Room Delivery for a Residence Area.
- If there is more than one area, then click the Add New Area link, which adds a new Area Name field for you to enter the area name. Repeat this step for all areas that need to be added.
- Click the Save button to apply your changes.
Note: When you add multiple areas to a building, the system will automatically sort the areas in alphanumeric order.
Renaming a Campus, Building or Area
To name a campus, building or area, complete the following steps:
-
Open the Residence Builder screen.
- Expand the sections as needed.
- For a campus, building or area you want to rename, click its ellipsis and select Edit [Name]. The Edit [Name] modal appears (second screenshot below).
- Enter the new name, and then click the Save button.
Deleting a Campus, Building or Area
A campus, building, or residence area can be deleted from your facility assuming that the campus, building or residence area does not have resident/patient profiles assigned. To do so:
-
Open the Residence Builder screen.
- Expand the sections as needed.
- For a campus, building or area you want to delete, click its ellipsis and select Delete [Name] (first screenshot below). Assuming the unit does not have any resident/patient profiles assigned, then a confirmation message appears (second screenshot below).
- Click the Yes, Delete [Name} button.
Adding Rooms and Beds
To add rooms and beds, see the following separate articles:
Note: It is possible to deactivate beds as a component in the Residence Builder, as you can with campuses and buildings (via the Residence Area Settings; accessed by clicking the Settings button).
FAQs
Is there a way to move a residence area from its current building to another building?
No. It is not possible to move a residence area to another building. You must recreate the residence area in its desired building, and then remove the original residence area.